NEWS AND EVENTS
ASTA Intertek recognized our lab as a level 4 test laboratory and found to comply with the relevant requirement of ISO / IEC 17025 : 2017 and authorized to undertake test work for ASTA certification purposes for the product types and standards.
TESTING LABORATORY | HEAD OFFICE |
IMRAN KHAN LODI, TECHNICAL HEAD - TESTING LABORATORY Tel: (+965) 24771149, 24771174 Fax: (+965) 24767341 Email: testing@ahleialab.com imran@ahleiasg.com |
AL-AHLEIA SWITCHGEAR CO. k.s.c.c P.O. Box 25876, Safat – 13119, Kuwait. Subhan In. Area, Block 3, Street 101 Plot 119 Tel: (+965) 1822600 – Fax (+965) 24761963 – C.R. 33118 Email: factory@ahleiasg.com |
ISO 17025 was awarded and accredited to Al-Ahleia Switchgear Co. in March 2014 in recognition of our competence and adherence to the scope of the accreditation by our testing laboratories and in-house testing procedures.
UKAS is recognised globally as the body responsible for assessing and accrediting the competence of organisations in the technical areas of Calibration, Testing, Inspection and Certification of systems and products.
About UKAS (Read More)
Tests are strictly conducted in accordance with the latest edition of Internationally recognised standards.
Type Test Certification is issued when testing is conducted strictly in accordance with recognised standards.
Type Test Performance Reports are issued for the Development Tests and test conducted according to the client’s requirements, as per the recommended standard.
Al-Ahleia Switchgear Company was the first organisation in the Middle East to be Internationally Accredited by UKAS (United Kingdom Accreditation Services). UKAS is recognised globally as the body responsible for assessing and accrediting the competence of organisations in the technical areas of Calibration, Testing, Inspection and Certification of systems and products.
ISO 17025 was awarded and accredited to Al-Ahleia Switchgear Co. in March 2014 in recognition of our competence and adherence to the scope of the accreditation by our testing laboratories and in-house testing procedures.
Tests are strictly conducted in accordance with the latest edition of Internationally recognised standards.
Type Test Certification is issued when testing is conducted strictly in accordance with recognised standards.
Type Test Performance Reports are issued for the Development Tests and test conducted according to the client’s requirements, as per the recommended standard.
LAB - 1 |
|
The following Type Tests are carried out for Switchgear in Lab-1.
|
|
![]() |
![]() |
Lightning impulse voltage test (M.V Switchgear) | Lightning impulse voltage test (L.V Switchgear) |
![]() |
![]() |
Lab inside view |
Temperature rise test and contact resistance measurement |
![]() |
![]() |
Tightness test on gas filled switchgear |
IP test against ingress of splashing water |
![]() |
|
Verification of strength (Lifting) for L.V switchgear |
|
|
|
Partial Discharge Test is carried out. | |
![]() |
![]() |
Partial Discharge Test is carried out. | Partial Discharge Test on M.V switchgear |
LAB - 2 |
|
The following Type/Routine Tests are carried out for Distribution Transformer in Lab-2.
|
|
![]() |
![]() |
Lab view |
Temperature rise test |
![]() |
![]() |
Sound level test |
Capacitance/Tan Delta of transformer oil |
![]() |
|
Sweep frequency response analysis |
LAB - 3 |
|
The following Type/Routine Tests are carried out for Power Transformer in Lab-3.
|
|
![]() |
![]() |
Lab view |
Lightning impulse & power frequency withstand voltage test |
![]() |
![]() |
Hydraulic pressure deflection test |
Calibration lab view |
![]() |
![]() |
Dissolved gas analysis of transformer oil |
Oil Sampling & oil breakdown voltage test |
![]() |
![]() |
Temperature calibration |
Intermediate check for pressure |